{"id":247,"date":"2013-08-06T22:27:00","date_gmt":"2013-08-07T03:27:00","guid":{"rendered":"http:\/\/safetga.org\/?p=247"},"modified":"2013-12-14T15:55:07","modified_gmt":"2013-12-14T20:55:07","slug":"tower-grove-ave-gets-a-new-coat-of-paint","status":"publish","type":"post","link":"http:\/\/safetga.org\/?p=247","title":{"rendered":"Tower Grove Ave gets a new coat of paint"},"content":{"rendered":"<p>We&#8217;re happy to observe that sections of Tower Grove Avenue got bike lanes repainted this week. There are also bright shiny new sharrows from Vandeventer north to Clayton. Best of all, a short stretch of bike lane was painted on southbound TGA at Vandeventer, between the right-turn and straight-ahead lanes, to allow riders to advance to the front of the intersection. Well placed sharrows guide riders to the entrance of this 100&#8242; section, and the bike lane starts across the intersection.<\/p>\n<div id=\"attachment_244\" style=\"width: 310px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/safetga.org\/wp-content\/uploads\/2013\/08\/IMG_2619.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-244\" class=\"size-medium wp-image-244\" alt=\"Shaw to Vandeventer got a new coat of paint.\" src=\"http:\/\/safetga.org\/wp-content\/uploads\/2013\/08\/IMG_2619-300x200.jpg\" width=\"300\" height=\"200\" srcset=\"http:\/\/safetga.org\/wp-content\/uploads\/2013\/08\/IMG_2619-300x200.jpg 300w, http:\/\/safetga.org\/wp-content\/uploads\/2013\/08\/IMG_2619.jpg 1000w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-244\" class=\"wp-caption-text\">Shaw to Vandeventer got a new coat of paint.<\/p><\/div>\n<p><!--more--><br \/>\n<div id=\"attachment_245\" style=\"width: 208px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/safetga.org\/wp-content\/uploads\/2013\/08\/IMG_2770-Edit.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-245\" class=\"size-medium wp-image-245\" alt=\"New sharrows have been placed all along Tower Grove Avenue from Vandeventer to Clayton.\" src=\"http:\/\/safetga.org\/wp-content\/uploads\/2013\/08\/IMG_2770-Edit-198x300.jpg\" width=\"198\" height=\"300\" srcset=\"http:\/\/safetga.org\/wp-content\/uploads\/2013\/08\/IMG_2770-Edit-198x300.jpg 198w, http:\/\/safetga.org\/wp-content\/uploads\/2013\/08\/IMG_2770-Edit.jpg 660w\" sizes=\"auto, (max-width: 198px) 100vw, 198px\" \/><\/a><p id=\"caption-attachment-245\" class=\"wp-caption-text\">New sharrows have been placed all along Tower Grove Avenue from Vandeventer to Clayton.<\/p><\/div><\/p>\n<div id=\"attachment_246\" style=\"width: 209px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/safetga.org\/wp-content\/uploads\/2013\/08\/IMG_2778-Edit.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-246\" class=\"size-medium wp-image-246\" alt=\"Short &quot;bike lane&quot; on southbound Tower Grove Ave at Vandeventer allows cyclists to advance to the intersection.\" src=\"http:\/\/safetga.org\/wp-content\/uploads\/2013\/08\/IMG_2778-Edit-199x300.jpg\" width=\"199\" height=\"300\" srcset=\"http:\/\/safetga.org\/wp-content\/uploads\/2013\/08\/IMG_2778-Edit-199x300.jpg 199w, http:\/\/safetga.org\/wp-content\/uploads\/2013\/08\/IMG_2778-Edit.jpg 664w\" sizes=\"auto, (max-width: 199px) 100vw, 199px\" \/><\/a><p id=\"caption-attachment-246\" class=\"wp-caption-text\">Short &#8220;bike lane&#8221; on southbound Tower Grove Ave at Vandeventer allows cyclists to advance to the intersection.<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>We&#8217;re happy to observe that sections of Tower Grove Avenue got bike lanes repainted this week. There are also bright shiny new sharrows from Vandeventer north to Clayton. Best of all, a short stretch of bike lane was painted on<span class=\"ellipsis\">&hellip;<\/span><\/p>\n<div class=\"read-more\"><a href=\"http:\/\/safetga.org\/?p=247\">Read more &#8250;<\/a><\/div>\n<p><!-- end of .read-more --><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,4],"tags":[],"class_list":["post-247","post","type-post","status-publish","format-standard","hentry","category-infrastructure-review","category-tower-grove-ave"],"_links":{"self":[{"href":"http:\/\/safetga.org\/index.php?rest_route=\/wp\/v2\/posts\/247","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/safetga.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/safetga.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/safetga.org\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"http:\/\/safetga.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=247"}],"version-history":[{"count":5,"href":"http:\/\/safetga.org\/index.php?rest_route=\/wp\/v2\/posts\/247\/revisions"}],"predecessor-version":[{"id":503,"href":"http:\/\/safetga.org\/index.php?rest_route=\/wp\/v2\/posts\/247\/revisions\/503"}],"wp:attachment":[{"href":"http:\/\/safetga.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=247"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/safetga.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=247"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/safetga.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=247"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}